Ohio · Data centers and water · Detailed calculator
Type in a city, village, township or county in Ohio to see its water system and the streams it drains to. Then size a data center below and see roughly how much water it could use there, depending on how it's cooled.
This is the detailed calculator, with every range and chart. The simple view shows the same estimates in pictures.
Ohio proposals
Projects that have come up at public meetings or in the local news. If the company or the utility has put out a water number, it's listed with where it came from. Open a project to compare that number with our estimate.
Ohio actions
Who decides
Rezoning, special land use and site plans. Can attach conditions, adopt a moratorium, and write water standards into its ordinance.
Whether it can serve the project within its plant capacity and wholesale contracts, and what the site may discharge to the sewer.
Large withdrawals from wells (registration at 100,000 gallons a day, permits above 2 million), direct discharges, wetlands and floodplains.
Methods and sources
The model turns the computers' heat into evaporation, hour by hour, using 30 years of weather from eight places in Michigan and the methods in published studies. We don't know each project's exact design, so every estimate is run 200 times with different settings. The big number is the middle result; the range covers the middle 80%. Place information comes from Census, EPA, USGS, NOAA and EGLE. The methods page has the details, the checks against real data, and a log of changes.
The calculator covers the campus's water, electricity and runoff on the site. It does not count new water or sewer connections, power lines, access roads or other construction beyond the site.
| Water taken | What the campus draws from a water system, wells or a lake. |
|---|---|
| Evaporation | Water that cools by turning to vapor. It leaves as vapor and does not come back here. |
| Drift | Droplets carried out of a cooling tower in the air. |
| Blowdown | Water drained from a cooling tower to keep minerals from building up. |
| Leaks | Small losses from a closed loop, replaced with new water. |
| Outside air | A little air brought in to ventilate the building. It brings heat and moisture with it. |
| Humidifiers | Add moisture in very dry winter air. Not every campus has them. |
| Condensate | Water a coil removes from humid outside air. It comes from the air, so it joins the wastewater without being taken from a water system. |
| PUE | All the campus's electricity divided by what the computers use. |
Corrections
If something here is wrong or out of date, tell us. We read every one, and any change goes in the log on the methods page with the date and the reason.
Looking at a specific proposal? Northline Hydrology reviews what large new water users mean for local water and streams.